Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Ruixin |
Model Number : | 12 inch 14inch 16inch |
Certification : | API |
Payment Terms : | T/T |
Supply Ability : | 1 set 3 weels |
Delivery Time : | 3-4 weeks |
Wireline Pressure Control Wireline Hay Pulley
I. Overview:
The floor pulley is used to pull the wire from the top of the air
injection pipe to the steel roller plane, so that the tension point
of the wire is moved from the vertex to the oil supply tree,
thereby reducing the steel wire or side tension load to prevent the
air injection pipe from being pulled by the slope. The ground
pulley can also be lifted, and the load direction of the steel wire
can also be changed.
II, technical parameters:
1. Applicable to steel wire specifications: 0.125 ";
2, pulley specification: 16 "
3. Safety load: 20KN (2.0 tons).
III. how to use
1. After connecting the ground pulley to the tensile table
(referred to), connect with the rope in the wellhead. According to
the length of the winch roller position, the wire is as parallel to
the roller plane (i.e., the wire angle of the steel wire from the
top of the anti-spray tube is approximately 90 degrees; If the
ground pulley is lifted, when the load direction of the wire or
cable (wire rope) is changed, the pulley is pulled directly with
the hook;
2, the handle on the hoisting block, the positioning pin is
retracted, and the sub-plate is rotated, and the pulley groove on
the pulley is exposed;
3, steel wire is loaded from the external anti-hopping block;
4, the sub-board is rotated in the clockwise direction, and then
the positioning pin is returned to the original position.
IV., the replacement of the pulley bearing:
1. Unscrew the lock nut M20 on the sliding wheel axis with a
wrench;
2, use the copper rod to play the pulley axis;
3, take out the pulley;
4, use the copper rod to strike the pulley, take out the deep
groove ball bearings;
5, load new deep groove ball bearings;
6, then load the sub-plate assembly, motherboard assembly, wear the
pulley axis;
7. Screw the lock nut M20 and adjust the bearing gap to
appropriate.
V. Notes:
1. Before using, you should check the main board assembly, the wear
of the anti-skid block on the sub-board assembly, ensuring that the
wire does not jump out of the wheel slot;
2. When storing, the heavy object strike pulley is made to avoid
deformation;
3, the ground pulley specification should be selected according to
the diameter of the steel wire, so as not to excessively bending
the wire and fatigue is damaged;
4, when the floor pulley is used in the landing bracket, it is
possible to prevent the wire from instantly relaxing and the pulley
is hit.
Welcome to contact us at any time.
![]() |