Sign In | Join Free | My himfr.com
Home > Wireline Pressure Control Equipment >

Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type

Ruixin Energy Equipmnet
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type from wholesalers
     
    Buy cheap Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type from wholesalers
    • Buy cheap Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type from wholesalers

    Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type

    Ask Lasest Price
    Brand Name : Ruixin
    Model Number : 2.5inch ID 3inch ID 4.06inch ID 5-1/8inch ID
    Certification : API
    Payment Terms : T/T, Western Union
    Supply Ability : 1 set 3 weeks
    Delivery Time : 3-4 weeks
    • Product Details
    • Company Profile

    Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type

    Double Ram BOP 5K Wireline Pressure Control Preventer


    I. Introduction

    A BOP (Blowout Preventer) is connected with the top of either wellhead adapter or Christmas tree. Annular

    space around wireline or slickline will be sealed by closing lubricator valve when the wireline or slickline is

    still in the hole. Then the pressure in the well will be sealed to prevent blowout. Single ram BOP is usually

    used for wireline and double ram BOP is for wire stick accordingly. Three ram BOP (with shear ram) is also

    available. Max. work pressure is up to 105MPa (15,000PSI). BOP for standard and H2S services are both

    available with manual or hydraulic control methods.


    Model

    Work Pressure

    Bore

    Wireline / Slickline OD.

    Control Method

    Remarks

    FZ6.3-35

    5000PSI

    63.5mm

    0.125"

    Manual/ Hydraulic

    Single

    Ram

    2FZ6.3-35

    5000PSI

    63.5mm

    7/32"

    Hydraulic

    Double Ram

    FZ7.6-35

    5000PSI

    76.2mm

    0.125"

    Manual/ Hydraulic

    Single Ram

    2FZ7.6-35

    5000PSI

    76.2mm

    7/32"

    Hydraulic

    Double Ram

    FZ10.2-35

    5000PSI

    102mm

    0.125"

    Manual/ Hydraulic

    Single Ram

    2FZ10.2-35

    5000PSI

    102mm

    7/32"

    Hydraulic

    Double Ram

    FZ6.3-70

    10000PSI

    63.5mm

    0.125"

    Hydraulic

    Single Ram

    2FZ6.3-70

    10000PSI

    63.5mm

    7/32"

    Hydraulic

    Double Ram

    FZ7.6-70

    10000PSI

    76.2mm

    0.125"

    Hydraulic

    Single Ram

    2FZ7.6-70

    10000PSI

    76.2mm

    7/32"

    Hydraulic

    Double Ram

    FZ10.2-70

    10000PSI

    102mm

    0.125"

    Hydraulic

    Single Ram

    2FZ10.2-70

    10000PSI

    102mm

    7/32"

    Hydraulic

    Double Ram

    FZ6.3-105

    15000PSI

    63.5mm

    0.125"

    Hydraulic

    Single Ram

    2FZ6.3-105

    15000PSI

    63.5mm

    7/32"

    Hydraulic

    Double Ram

    FZ7.6-105

    15000PSI

    76.2mm

    0.125"

    Hydraulic

    Single Ram

    2FZ7.6-105

    15000PSI

    76.2mm

    7/32"

    Hydraulic

    Double Ram

    FZ10.2-105

    15000PSI

    102mm

    0.125"

    Hydraulic

    Single Ram

    2FZ10.2-105

    15000PSI

    102mm

    7/32"

    Hydraulic

    Double Ram


    III. Structure Characteristics

    The BOP consists of body, ram assembly, equalizing valve, end cap, stem, handle, O ring, etc.


    IV. Operation Procedure

    1. Installation

    1.1 Close the wellhead valve. Clean the seal bore of wellhead adapter. Then install it.

    1.2 Install the lubricator or other device in to the top of BOP.

    2. Open

    2.1 Open the valve plug of equalizing valve with allen wrench.

    2.2 After the pressure is equalized, rotate the handle anticlockwise. Then ram will be opened.

    2.3 Close the equalizing valve.

    3. Close.

    Rotate the handle clockwise. Then ram will be closed.


    IV. Maintenance

    1. Disassemble BOP after operation and clean the parts. Check the sealing-face or seal parts carefully.

    Replace the worn parts in time.

    2. After each disassembly, it is a must to conduct the seal test.

    3. Strength test must be conducted on time.

    Welcome to contact us at any time.

    Quality Double Ram BOP 5K Pressure Control Wireline Preventer Manual Type for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Ruixin Energy Equipmnet
    *Subject:
    *Message:
    Characters Remaining: (0/3000)